Your Strategic Manufacturing Partner for Solar & Storage Projects
Minimize project risks and optimize CAPEX with Ecko Energy. We provide EPCs and Developers with direct-from-factory access to high-performance PV modules, inverters, and utility-scale BESS. From 1MWh C&I projects to 100MWh+ utility deployments, we deliver the supply chain stability, technical compliance, and cost-effectiveness you need to win bids and execute projects on time.
Value Proposition for EPCs
Factory-Direct Cost Advantage
Cut out the middlemen. Our OEM model ensures you get the most competitive pricing on the market, helping you lower the Levelized Cost of Electricity (LCOE) and win more tenders.
Tier-1 Supply Chain Reliability
We secure long-term contracts with upstream raw material suppliers (especially Tier-1 battery cells) to guarantee delivery timelines, even during market shortages.
Technical "Bankability"
Our products carry full global certifications (UL, IEC, VDE) required by banks and investors. We provide comprehensive documentation support for your project's due diligence.
Project Lifecycle Support
System sizing, layout design assistance, and grid-code compliance checks (e.g., UL1741SB, IEEE1547).
Customizing BESS voltage, power density, and container layout to match specific site constraints. Branding options available for project consistency.
DDP (Delivered Duty Paid) services available to major markets. Modular shipping designs to reduce freight costs.
Remote or on-site technical support during the critical grid-connection phase to ensure smooth handover.
Project-Ready Portfolio

Utility-Scale BESS
20ft/40ft Liquid-Cooled Containers. 3MWh - 5MWh+ per unit. Pre-integrated fire suppression and PCS.

High-Power String Inverters
100kW - 350kW models for commercial and ground-mount utility projects. High DC/AC ratio support.

Bifacial Solar Modules
High-efficiency N-type Bifacial panels designed to maximize yield from ground reflection.
Track Record

Project A: 50MWh Solar+Storage Farm in Europe.
● Role: Full BESS & Inverter Supplier.
● Highlight: Delivered 30 days ahead of schedule.
Project B: 2MWh Grid Support Project in North America.
● Role: Custom OEM Container Solution.
● Highlight: Passed local utility interconnection tests on first try.